PROJECT INFORMATION

212101-Methodist Charlton ED Relocation
PROJECT NAME:

PROJECT SECTOR:

healthcare
PROJECT BUDGET:
$6,400,000.00

PHOTO UPDATES:

REPORTING MONTH:

August 16, 2022

REPORTING PERSON:

Bhavik Mishra

Company:

212101-Methodist Charlton ED Relocation
3-story addition at Methodist Charlton Medical Center. Level 1 contains an enclosed parking garage and mechanical Spaces, approximately 40,000 square feet. Level 2 contains a relocated and enlarged emergency department, Approximately 40,000 square feet. Level 3 contains shell space for a future patient room floor, approximately 30,000 Square feet. The project also includes a remote plant (8,000 square feet)
Company:
PROJECT SECTOR:
healthcare
PROJECT BUDGET:
$6,400,000.00
OUR PORTION OF THE WORK:
$0.00
REPORTING MONTH:
August 16, 2022
REPORTING PERSON:
Bhavik Mishra
PHOTO UPDATES:
TEAM
Bhavik Mishra
Bhavik Mishra
Project Manager

SAFETY

Number of Accidents:
0
Number of Incidents:
2
Comments on Safety:
Cumulative Work Day - 273 Cumulative Man Hrs - 282,567 Days W/O incident - 116

QUALITY

Number of Inspections:
620
Number of Non-Compliant Items:
5
Comments on Quality:
All Hard lids are reframed as a result of inadequate coordination between the trade partners.

SCHEDULE

Is the Project On Schedule:
No
Project Milestones:
Note:- Overall the project is 35 days behind the schedule Approaching Milestone Certificate of Occupancy - 9/26/22 Owner Move-in Start - 10/19/22 100% THHS Inspection - 11/22/22 First Patient - 12/15/22 The Approaching milestone is not able to achieve because slider doors for exam rooms got delayed due to unavailability of material and supply chain issues.
###
Comments on Schedule:
DIVISION 03 – CONCRETE • North canopy colored paving concrete installed • ED north paving formwork and reinforcing installation in progress • Wheatland signal dart stop foundation installation in progress • Existing North main parking concrete saw cutting and fine grading DIVISION 07 – ENVELOPE • ED North Composite wood look panel (Geolam) started • ED Glass Fiber Reinforced Concrete ongoing at Stair #2 pop-up and west elevation • ED North Level 3 scaffolding erection & Z-girl installation for Terra Cotta • ED South canopy light fixture layout and framing in progress DIVISION 09 – FINISHES • ED Level 2, Area A & B millwork installation ongoing • ED Level 2, Area B ceiling grid and hard lid framing in progress • ED Level 1, Area A & B painting continues • ED Level 2, Area A & B tile ongoing • ED Level 2, drywall installation and close walls nearing completion DIVISION 22 – PLUMBING • ED Level 2, Area C in-wall rough-in complete • ED Level 2 overhead domestic water insulation in progress DIVISION 23 – HVAC • Campus chilled water transfer complete • ED and Remote Plant Air Conditioning-on preparation work complete • ED Level 2 Area D ductwork and hydronic piping and insulation ongoing • ED CT Chiller installed DIVISION 26 – ELECTRICAL • ED Level 2, Area C & D in-wall rough-in complete • ED Level 2, Area C & D overhead layout and rough in for framing • ED Level 2 wire pull and terminations continue overhead • ED Level 2, Area A & B light fixture wiring in progress DIVISION 31 – SITE • Wheatland Signal existing utilities locate and layout continues • ED garage ramp grading in progress • ED site Zone 1 irrigation installation in progress Approaching Milestone Certificate of Occupancy - 9/26/22 Owner Move-in Start - 10/19/22 100% THHS Inspection - 11/22/22 First Patient - 12/15/22 The Approaching milestone is not able to achieve because slider doors for exam rooms got delayed due to unavailability of material and supply chain issues. Note:- Overall the project is 35 days behind the schedule

Budget

Overall Construction Cost
$0.00
Original Contract Value
$0.00
Current Contract Value
$0.00
Contract Value Difference
$0.00
Pending Change Orders
$0.00
Original Fee
$0.00
Projected Fee
$0.00
Difference in Fee
$0.00
Collected Fee to Date
$0.00
General Conditions/Requirements
$0.00
Total Expenses
$0.00
Difference
$0.00
Monthly GC/GR Allowance
$0.00
Reporting Month Expenses
$0.00
Reporting Month Difference
$0.00
Total Revenue
$0.00
Anticipated Profit
$0.00
Actual Profit
$0.00
Comments on Cost:

TRADE PARTNERS

Company
Monthly Rating

(1 being the worst, 5 being the best)

Comments
No data was found

CLIENTS

Company
Monthly Rating
Comments
No data was found